28th-Dec-21, 01:25 PM
Hi Tony and Anthony,
Let's start with some pictures of the construction process:
Drawing the track on two 8mm mdf plates 2.44mx1.22m. 2x6 times 10mm vertical multiplex base strips inside the outer frame.
The first outer track part is glued, screwed and clamped to the base frame. The first half of the entire track is glued, screwed and clamped.
The second construction frame is glued and screwed against the first one. The unfinished track placed on its side.
As a result, the overall dimensions grew to 4.88mx1.22m.
Let's start with some pictures of the construction process:
Drawing the track on two 8mm mdf plates 2.44mx1.22m. 2x6 times 10mm vertical multiplex base strips inside the outer frame.
The first outer track part is glued, screwed and clamped to the base frame. The first half of the entire track is glued, screwed and clamped.
The second construction frame is glued and screwed against the first one. The unfinished track placed on its side.
As a result, the overall dimensions grew to 4.88mx1.22m.