29th-Sep-21, 11:23 PM
Hello again,
I’m planning a track for my basement, fixed to a table with approximately 3,15m x 1,00m. It’s mainly for MT and faster. As I want to race with my soon-to-be six year old son, his friends and their dads it’s supposed to be rather easy to handle on low voltages.
The bridge will elevate about 4cm from the ground level, the underpass will be lowered 4cm. So there’s a space of 8cm under the bridge.
Before mounting it on the table all track parts will be glued to Forex board (3mm or 5mm) to keep the track even. The curbs will also be glued to the Forex basis
The whole construction will be made of a combination of a wooden grid filled with XPS foam board and flat landscape made out of XPS as well. In the end the whole construction will be a foldaway table, as there’s not a lot of space.
What do you think?
I’m planning a track for my basement, fixed to a table with approximately 3,15m x 1,00m. It’s mainly for MT and faster. As I want to race with my soon-to-be six year old son, his friends and their dads it’s supposed to be rather easy to handle on low voltages.
The bridge will elevate about 4cm from the ground level, the underpass will be lowered 4cm. So there’s a space of 8cm under the bridge.
Before mounting it on the table all track parts will be glued to Forex board (3mm or 5mm) to keep the track even. The curbs will also be glued to the Forex basis
The whole construction will be made of a combination of a wooden grid filled with XPS foam board and flat landscape made out of XPS as well. In the end the whole construction will be a foldaway table, as there’s not a lot of space.
What do you think?

![[+]](https://slotracer.online/community/images/bootbb/collapse_collapsed.png)