29th-Apr-21, 03:41 PM
Thanks for the responses. I like the idea of the expanding foam. I might try and get it done in one shift to avoid the tube cleaning!
The existing track pieces seem to be stuck to the ply base with silicon. I think I will continue with that method once I settle on the layout, and give the track pieces a good clean.
I was thinking of building up the ground level either side of the track pieces with the right thickness foamboard to give a flush finish either side of the track. I am imagining the expanded foam will be the wrong product in the wrong location for that. Any objections to the use of foamboard, or any better ideas?
The existing track pieces seem to be stuck to the ply base with silicon. I think I will continue with that method once I settle on the layout, and give the track pieces a good clean.
I was thinking of building up the ground level either side of the track pieces with the right thickness foamboard to give a flush finish either side of the track. I am imagining the expanded foam will be the wrong product in the wrong location for that. Any objections to the use of foamboard, or any better ideas?
I love puttering with gears

![[+]](https://slotracer.online/community/images/bootbb/collapse_collapsed.png)