25th-Oct-26, 06:00 PM
Started on upper level construction today:
![[Image: UL-SE.thumb.jpg.a59fb7b46f98f80703ff313798f2a75a.jpg]](https://media.invisioncic.com/j329829/monthly_2026_10/UL-SE.thumb.jpg.a59fb7b46f98f80703ff313798f2a75a.jpg)
Checking all is well for the bridge positioning:
![[Image: UL-BC.thumb.jpg.b512cb44df219fcb8ad22bd7e83df63f.jpg]](https://media.invisioncic.com/j329829/monthly_2026_10/UL-BC.thumb.jpg.b512cb44df219fcb8ad22bd7e83df63f.jpg)
And the (hopefully) Idiot proof colour coded point control !
![[Image: mimic-panels.thumb.jpg.5645ed42d72edae10...dede0e.jpg]](https://media.invisioncic.com/j329829/monthly_2026_10/mimic-panels.thumb.jpg.5645ed42d72edae10f08ee0dfbdede0e.jpg)
The bridge was 3DP by me, I took an existing drawing, but TBH in the end I had completely redesigned it !
Designed and printed from scratch, I also made the viaduct, which is over 5ft long:
![[Image: via1.thumb.jpg.c3cc6a7363f4eebf11eef41cbf3697fc.jpg]](https://media.invisioncic.com/j329829/monthly_2026_10/via1.thumb.jpg.c3cc6a7363f4eebf11eef41cbf3697fc.jpg)
Checking all is well for the bridge positioning:
And the (hopefully) Idiot proof colour coded point control !
The bridge was 3DP by me, I took an existing drawing, but TBH in the end I had completely redesigned it !
Designed and printed from scratch, I also made the viaduct, which is over 5ft long:

![[+]](https://slotracer.online/community/images/bootbb/collapse_collapsed.png)