6th-Feb-22, 03:45 AM
Decided that it made no sense to have a stop line from the tunnel onto the main straight and then not have anything at the end where the straight runs into the mountains. So added a detail.
Fun bit was that the road had a repair patch right where the Stop line had to go so had to respect that.
Threw in a new patch of concrete in the corner in a slightly different shade, patch team couldn’t get same ingredients as when they originally resurfaced the whole track
Fun bit was that the road had a repair patch right where the Stop line had to go so had to respect that.
Threw in a new patch of concrete in the corner in a slightly different shade, patch team couldn’t get same ingredients as when they originally resurfaced the whole track

![[+]](https://slotracer.online/community/images/bootbb/collapse_collapsed.png)