30th-Sep-22, 06:46 PM
Hi guy's, I've been plugging away at building up the track suports and scenery base.
Boy this is a time consuming and messy job, it's going to look like it's snowing when I start shaping and sanding.
I cut a thin base from 6mm mdf and then cut top run off sections and glued those together.
There's probably a easier way but this worked for me.
Next was using loads of insulation board , various thickness's I've been collecting off industrial sites over time.
I've got the elevations I want and glued everything with pva, still got a few more lower levels to add and then start cutting and shaping/sanding.
Cheers for looking
Boy this is a time consuming and messy job, it's going to look like it's snowing when I start shaping and sanding.

I cut a thin base from 6mm mdf and then cut top run off sections and glued those together.
There's probably a easier way but this worked for me.
Next was using loads of insulation board , various thickness's I've been collecting off industrial sites over time.
I've got the elevations I want and glued everything with pva, still got a few more lower levels to add and then start cutting and shaping/sanding.
Cheers for looking