ModeL Railway #2 begins - as yet un named - Printable Version
+- SlotRacer Forum (
https://slotracer.online/community)
+-- Forum: Tracks & Scenery (
https://slotracer.online/community/forumdisplay.php?fid=8)
+--- Forum: Model Railways (
https://slotracer.online/community/forumdisplay.php?fid=68)
+--- Thread: ModeL Railway #2 begins - as yet un named (
/showthread.php?tid=4327)
RE: ModeL Railway #2 begins - as yet un named -
Savage GT - 10th-Nov-25
A milestone has been reached, its "only" taken me 18 months since the boards were in place.
But today the lower level track work has finally met up, just around 2.5m of wiring to complete .... and all the point motors , but here we are !
[attachment=44587]
And the latest full track plan, blue being the upper level, yet to be started.
[attachment=44586]
RE: ModeL Railway #2 begins - as yet un named -
Savage GT - 25th-Oct-26
Started on upper level construction today:
Checking all is well for the bridge positioning:
And the (hopefully) Idiot proof colour coded point control !
The bridge was 3DP by me, I took an existing drawing, but TBH in the end I had completely redesigned it !
Designed and printed from scratch, I also made the viaduct, which is over 5ft long: