Fred
(Member)


Registration Date: 30th-Nov-21
Date of Birth: 4th-Jan-67 (55 years old)
Local Time: 6th-Jul-22 at 07:10 PM
Status: Offline

Fred's Forum Info
Registration Date:
30th-Nov-21
Last Visit:
3rd-Jul-22, 06:26 AM 06:26 AM
Total Posts:
18 (0.08 posts per day | 0.07 percent of total posts)
(Find All Posts)
Total Threads:
3 (0.01 threads per day | 0.1 percent of total threads)
(Find All Threads)
Time Spent Online:
20 Hours, 57 Minutes, 58 Seconds
Total Likes Received: 73 (0.33 per day | 0.22 percent of total 33752)
(Find All Threads Liked ForFind All Posts Liked For) Total Likes Given: 56 (0.26 per day | 0.17 percent of total 33794)
(Find All Liked ThreadsFind All Liked Posts)

Additional Info About Fred
Gender:
Male
Fred's Most Liked Post
Post Subject Numbers of Likes
RE: Time to introduce the NMR 3.0 8
Thread Subject Forum Name
Time to introduce the NMR 3.0 Show us your track
Post Message
The time passing very quickly despite this most uncertain period, I try to take advantage of a few days of vacation to advance the decoration of the track

First of all an attempt to dress the flank of the access ramp to the bridge with the walls made of cardboard.
For the moment they are just placed waiting for me to decide for their treatment (brick walls or concrete plates, I still hesitate)
We also see in situation the bridge dressing the time bridge :


[Image: p1110062-2-58bdba7.jpg]

Processing still raw on one side of the tunnel; at this stage everything is still removable :
[Image: p1110064-2-58bdba9.jpg]

The loop at the other end of the tunnel, which is currently under construction according to the techniques I had used on my previous track (fine cardboard mesh + sheathing of newspaper soaked with tapestry glue) :
[Image: p1110070-2-58bdbab.jpg]

Finally, although the artist has not yet validated it, I took the opportunity to set up the first of the panels that Gabrielle, my daughter, planned to make to dress her dad’s toy :
[Image: p1110066-2-58bdbad.jpg]

To be continued ...